Buddhism

Religion and churches (255)
Buddhism (1651)

Related articles from the Densho Encyclopedia :
Yoshiko Yamanouchi

Facilities
Format
Genre
Usage

Use <Ctrl> or (⌘) keys to select multiple terms

1651 items
Letter from the Seattle Buddhist Church to Pierce A. Horrocks (ddr-sbbt-4-40)
doc Letter from the Seattle Buddhist Church to Pierce A. Horrocks (ddr-sbbt-4-40)
A letter from the Seattle Buddhist Church (Seattle Betsuin Buddhist Temple) to Pierce A. Horrocks, Architect, authorizing hiring W. P. Fuller and Company for window work.
Letter from T. Ichikawa to Pierce A. Horrocks (ddr-sbbt-4-27)
doc Letter from T. Ichikawa to Pierce A. Horrocks (ddr-sbbt-4-27)
A letter from Tatsuya Ichikawa, President of the Buddhist Mission Society (Seattle Betsuin Buddhist Temple), to Pierce A. Horrocks, Architect, advising him that the Board of Directors has formally approved plans and specifications for the church edifice and social hall.
Excavator at the temple construction site (ddr-sbbt-4-67)
img Excavator at the temple construction site (ddr-sbbt-4-67)
A construction worker operates an excavator at the temple construction site (1427 Main S Street).
Men carry the butsudan (ddr-sbbt-4-19)
img Men carry the butsudan (ddr-sbbt-4-19)
Men carry the butsudan to enshrine the altar at 1020 Main Street.
Report on painting (ddr-sbbt-4-43)
doc Report on painting (ddr-sbbt-4-43)
A report from the Cawsey Construction Company with painting estimates for the Buddhist Mission Society (Seattle Betsuin Buddhist Temple).
Adults and children line up for a procession (ddr-sbbt-4-14)
img Adults and children line up for a procession (ddr-sbbt-4-14)
Adults and children participate in a procession to move the Seattle Betsuin Buddhist Temple's butsudan to 1020 Main Street.
Construction at the new temple building (ddr-sbbt-4-130)
img Construction at the new temple building (ddr-sbbt-4-130)
Partially built floors and walls for the new temple building (1427 S. Main Street).
Trucks parked at the temple construction site (ddr-sbbt-4-71)
img Trucks parked at the temple construction site (ddr-sbbt-4-71)
Trucks parked at the temple construction site (1427 S. Main Street).
Main entrance lamp design (ddr-sbbt-4-52)
doc Main entrance lamp design (ddr-sbbt-4-52)
A custom design for the Buddhist Mission (Seattle Betsuin Buddhist Temple) of a brown wrought iron finished lamp for the main entrance.
Aerial view of the temple construction site (ddr-sbbt-4-83)
img Aerial view of the temple construction site (ddr-sbbt-4-83)
An aerial view of the partially built new temple building (1427 S. Main Street).
Dedication service at the Seattle Betsuin Buddhist Temple (ddr-sbbt-4-192)
img Dedication service at the Seattle Betsuin Buddhist Temple (ddr-sbbt-4-192)
Dedication service at the Seattle Betsuin Buddhist Temple (1427 S. Main Street).
Two men stand at the corner of the new temple building (ddr-sbbt-4-80)
img Two men stand at the corner of the new temple building (ddr-sbbt-4-80)
Two men stand at the corner of the partially built new temple building (1427 S. Main Street).
Letter from the Buddhist Mission Society to Pierce A. Horrocks (ddr-sbbt-4-39)
doc Letter from the Buddhist Mission Society to Pierce A. Horrocks (ddr-sbbt-4-39)
A letter from the Buddhist Mission Society (Seattle Betsuin Buddhist Temple) to Pierce A. Horrocks, Architect, asking him to draw up plans for a moving picture booth in the Social Hall.
Temple entrance under construction (ddr-sbbt-4-123)
img Temple entrance under construction (ddr-sbbt-4-123)
A view of the mostly completed entrance for the new temple building (1427 S. Main Street).
Letter from the Seattle Buddhist Church to Pierce A. Horrocks (ddr-sbbt-4-31)
doc Letter from the Seattle Buddhist Church to Pierce A. Horrocks (ddr-sbbt-4-31)
A letter from the Seattle Buddhist Church (Seattle Betsuin Buddhist Temple) to Pierce A. Horrocks, Architect, authorizing hiring Eckart Brothers, Inc. for plumbing, heating, and ventilation work.
Partially built temple roof (ddr-sbbt-4-102)
img Partially built temple roof (ddr-sbbt-4-102)
View of the partially built temple roof at the new temple building (1427 S. Main Street).
Temple entrance under construction (ddr-sbbt-4-125)
img Temple entrance under construction (ddr-sbbt-4-125)
A view of the partially completed entrance for the new temple building (1427 S. Main Street).
Support columns at the temple construction site (ddr-sbbt-4-94)
img Support columns at the temple construction site (ddr-sbbt-4-94)
Support columns at the temple construction site (1427 S. Main Street).
Workers unload lumber from a truck (ddr-sbbt-4-86)
img Workers unload lumber from a truck (ddr-sbbt-4-86)
Workers unload lumber from a truck at the temple construction site (1427 S. Main Street).
Flooring at the temple construction site (ddr-sbbt-4-127)
img Flooring at the temple construction site (ddr-sbbt-4-127)
Flooring for the new temple building (1427 S. Main Street).
Interior construction at the new temple building (ddr-sbbt-4-139)
img Interior construction at the new temple building (ddr-sbbt-4-139)
Men work on interior construction for the new temple building (1427 S. Main Street).
API